查电话号码 繁體版 English DefinitionFrancais日本語DefinitionIndonesia한국어Русский ไทย
登录 注册

gantry crane造句

"gantry crane"是什么意思  
造句与例句手机版
  • Qqct is equipped with 24 super postpanamax quay cranes of max . 70 tons / 70 meters and 77 rubber tyred gantry cranes and operated with the most advanced terminal management system navis sparcs / tms connected with radio data terminals for the most efficient and real time terminal management
    技术优势:现配备24台最大负荷70吨/外伸距70米的超巴拿马型集装箱装卸桥吊、 77台轮胎吊,与国际先进的码头生产管理系统sparcs / tms和无线数据终端相连接,实现准确、高效、实时的计划管理,提供方便快捷的客户信息查询。
  • Taking the cause analysis and its repair scheme optimization of the rotating platfome sleeve crack with the 16t / 33m gantry of the sixth harbour company of tianjin harbour as the main research line , the dissertation makes such researches as on the conception and method of caea of stevedoring gantry crane structure , which includes the generating and treating method , the controlling method on the units and meshes
    本文以天津港第六港埠公司16t 33m门机转台筒体开裂的原因分析和修复裂纹方案优化为主线,研究了装卸型门机结构caea的概念和方法,包括模型的生成和处理的方法、单元和网格的控制方法等。
  • The main points of innovation are as follows : systematic research is made on the caea structure modeling of the stevedoring gantry crane . the combination of theoratic modeling and experimental modeling in its method and technology improves the reliability and scientific reasonability to model and calculate the results
    本文的主要创新点是:系统地研究了装卸型门机结构caea建模的技术问题,采用理论建模与实验建模相结合的建模方法与技术,提高了模型及其计算结果的可靠性与科学性。
  • Speed controls for traction include not only electrical vehicles of horizontal transportation such as electrical trains , internal - combustion locomotives with electrical transmissions , underground metros , light fait locomotives , trolley buses , even magnetic suspension trains and electrical cars etc . , but also electrical vertical traction systems such as elevators , automatic moving staircases , mine winding engines , and gantry crane trucks etc
    牵引调速既包括电气火车、电传动的内燃机车、地下铁道、轻轨机车、无轨电车及磁悬浮列车和电动汽车等这类水平运输电动车辆,也包括电梯、自动电梯、矿井卷扬机和龙门吊车等电动竖直牵引系统。
  • The total area of the corporation covers about 200 chinese acres and the length of coastline is about 1 , 140 meters , the auxiliary facilities have taken shape the main facility and the equipment include the 30 , 000 dwt dry dock which is 192 meters long by 40 meters wide the gate width 32 meters and 10 meters deep , is to date the biggest dry dock in fujian province ; one fitting wharf length 65 meters , width 17 meters ; 16 tons portal crane 1 set , 16 tons gantry crane 1 set , mobile cranes 50t1 25t1 12t2 8t4 and other necessary transportation , coatings , the precision work equipment supplying air 120 m min , spraying grit more than 4 , 000 m day , renews the steel plate 12 15 t day we can finish repairing all kinds of ships under 40 , 000 dwt within 7 to 10 days our corporation obtains the first - class dockyard to repair and build steel - made ships lisence in 2001 , passed the national environmental protection appraisal in august 2002 , was designated shipbuilding in fujian for maintaining foreign ships in octobet 2002 , the dry dock , passage channel , the turning area , fitting wharf are passed by passage safety appraisal in march , 2003
    主要设施和设备有: 3万吨级干船坞一座长192米宽40米坞门净宽32米深10米是福建省目前最大的干船坞舾装码头一座长65米宽17米16吨门座起重机1台10吨门吊1台汽车吊8台50吨1台25吨1台12吨2台8吨4台以及与其相配套的运输喷涂精加工设备。每分种供气120立方米,日喷砂面积4000多平方米,日换钢板15 20吨。一般修船工期为7 10天。
  • Abstract : the paper introduces the erection of the steel box girder of a long - span steel box - concrete composite bridge using broad double guide beam without affecting the normal operation of electrified railway and marshalling yard under the bridge , including construction plan , design of gantry crane and guide beam , as well as key points of construction technology
    文摘:介绍在保证电气化铁路、编组站场正常运营情况下,运用宽幅式双导梁解决大跨度钢箱混凝土结合梁桥的钢箱梁架设技术难题,重点阐述了施工方案,龙门吊、导梁设计,工艺要点等。
  • The first part . task analyse of handling technology design . is explain the place , basic establishments entironment of yangshan port and the conditions basic tenet and technical parameter of design . the second part , project study out . is discuss the design contents the choice of the leading and the assistant engine , the form of the handling mechanisation system , project study out . the third part , size design , is count the berth pass capacity , the amount of handling engine , the area and capacity of yard , road and gate , the worker amount . the fourth part . technology and economy argumentation , commendable project confirm , is confirm the commendable project by technology and economy argumentation . in the end , considering the technology , economy and use . discourse commend the project of rubber - tyred gantry crane . at present . centre government is studying yangshan project , but in handling technology part of container terminal , the design is simply . so this discourse has important consult value . and has important value of economy and community too
    第一部分的装卸工艺设计任务分析主要就洋山港区的地理位置、基础设施、自然环境,设计前提条件,设计原则以及设计主要技术参数进行说明;第二部分的装卸工艺方案拟定主要就工艺设计的主要内容,主要机械及辅助机械选择,装卸机械化系统组成以及工艺设计方案拟定进行论述;第三部分的装卸工艺方案规模设计主要就泊位通过能力,装卸机械台数,堆场面积及堆存能力,道路及大门,司机及工人人数,工艺流程进行计算分析;第四部分的技术经济论证及推荐方案确定主要就技术、经济指标进行对比论证,并在此基础上确定推荐方案。
  • It's difficult to see gantry crane in a sentence. 用gantry crane造句挺难的
  • 更多造句:  1  2  3
如何用gantry crane造句,用gantry crane造句gantry crane in a sentence, 用gantry crane造句和gantry crane的例句由查查汉语词典提供,版权所有违者必究。